Recent work

The finish is the part you live with.

A look at the kind of work we take on, from a single fitted unit to a room taken back to brick. New jobs go up on Instagram as they come off the tools.

Project gallery

Seven jobs, and what each one involved.

A sage green shaker kitchen with a marble-topped island beneath a glazed lantern roof

01 / Building and renovation

Shaker kitchen and island

Fitted under a new lantern roof, so the runs were set out to the light rather than to the old room. Island brought in as one piece and levelled before the worktop went on.

A timber-clad garden room with a flat roof and a run of anthracite bi-fold doors

02 / Outdoor building

Cedar-clad garden room

Framed, clad and roofed on site. The bi-folds run the length of one elevation, so that wall was built plumb first and the frames set into a squared opening.

A dark handleless kitchen in a U-shape with a stone worktop, range cooker and split-face stone wall

03 / Building and renovation

Handleless kitchen

A U-shaped run with a range in the middle, so the two returns had to line through. Worktops cut and joined on site, and the stone wall built back to the corner.

Three oak cottage doors hung off a landing, with white architrave and wood-effect flooring

04 / Bespoke joinery

Internal doors and architrave

Three doors off one landing, so the gaps had to match each other as well as their own frames. Hinges chiselled in flush, architrave mitred to the angles the openings actually were.

  • The bathroom looking towards the walk-in shower, with a bespoke green door into the eaves on the left
  • The vanity unit under the window: a counter-top basin on a solid timber top over green shaker doors, with metro tiling behind
  • The full width of the bathroom, with the WC beside the vanity and the tiled shower enclosure to the right

1 / 3

05 / Building and renovation

Bathroom installation

A room with a sloping ceiling, so the shower went where the headroom was. Patterned floor set out from the centre line to keep the cuts equal at both walls, and the eaves cupboard door made to match the vanity.

Grey composite decking laid up to the doors of a cedar-clad garden room

06 / Finishes and outdoor

Composite decking

Framed at the bearer spacing the boards needed, with airflow left underneath. Set to fall away from the building so water never sits against the cladding.

A dark grey clad garden room with French doors and side windows, set on a level base

07 / Outdoor building

Garden room, anthracite

Base laid and levelled before anything was framed. Doors and windows set out symmetrically across the front so the cladding boards land evenly either side.

Beyond the gallery

Most of what we do never gets photographed.

Second-fix carpentry, a re-hung door, a floor levelled before the boards go down. Unglamorous, and the reason the visible part works.

Bespoke joinery

  • Alcove units and shelving
  • Wall panelling
  • Doors, skirting and architrave
  • Repairs and reassembly

Building and renovation

  • Kitchen fitting
  • Bathroom installation
  • Carpentry and structural work
  • Plastering and making good

Finishes and outdoor

  • Flooring
  • Painting and decorating
  • Garden rooms and outbuildings
  • Fencing, decking and clearance
  • Removals

Before and after

The same room, twice.

Photographed from the same spot at the start and at the end. The second picture is the easy one to take.

01 / Outdoor building

Garden room, framed to finished

Studwork, bracing and the roof deck go up first, and everything after that hangs off getting this stage square. Insulated and clad once it was closed in, with the doors set out on the centre line of the front elevation.

A garden room at frame stage: bare timber studs and bracing under a finished flat roof, open at the front
Before
The same garden room finished in cedar cladding with French doors and full-height windows either side
After

02 / Bespoke joinery

Knocked-through opening, doors hung

A bare opening between two rooms, squared and lined before anything was hung in it. Three doors after, set so the gaps between them match each other as well as the frame.

A wide bare opening between two rooms, lined but with no doors fitted
Before
The same opening with three glazed white doors hung in it, protective film still on the glass
After

03 / Outdoor building

Garden room, shell to finished

Framed and sheathed first, and made weathertight before any cladding went near it. The cedar goes on last so the boards can be set out to land evenly either side of the doors.

A garden room part-built, still in bare OSB sheathing with the doors fitted and no cladding
Before
The same garden room finished in cedar cladding with an anthracite roof trim and window
After

04 / Finishes and outdoor

Floor levelled and laid

The screed underneath had lifted and cracked right across the room. Levelled first, because nothing you lay on top hides a dip, then set out so the pattern runs square to the window wall.

A bare room with cracked, patchy screed where the old floor covering has been lifted
Before
The same room with parquet-effect flooring laid, running square to the window wall
After

What customers say

In their own words.

5 out of 5
“We are extremely happy with the worktop and splashback installation. The quality of workmanship is excellent, and the finish looks fantastic. Professional, reliable, and very tidy throughout the job. Would definitely recommend.”
Fabio BuitragoWorktop and splashbackvia Google
5 out of 5
“Amazing!!!!! To get someone to come out for a small job (6 interior doors to be fitted) is a miracle, but Frankie quoted, then came and did the job, excellently, he is a diamond. Have already asked him for a quote on another job. Courteous, friendly and put up with my dogs!!. Highly recommend.”
Christine BedfordSix internal doorsvia Google
5 out of 5
“Really happy to recommend FV joinery. They did an amazing job in my kitchen and really pleased with the floor tiling. Super efficient, friendly and reasonably priced for a great job. 5 * rating. Thank you.”
Louise CollingeKitchen and floor tilingvia Google
5 out of 5
“Very happy with the work. New shower fitted and various other small plumbing works carried out. Communication was good before the appointment. They came when they said they would. Polite, professional and respectful. Very little fuss. Will use again and would recommend to others.”
Chris MooreNew shower and plumbingvia Google
5 out of 5
“Franky from Fv joinery replaced the worktops in our kitchen and did an excellent job- highly recommend. High quality work and great communication from the start. Will be asking Franky to do further work.”
NaomiKitchen worktopsvia Google
5 out of 5
“Great workmanship, nothing too much trouble when things didn't always go to plan. Bathroom looks great thank you. Highly recommend.”
Andy KeeneyBathroomvia Google
5 out of 5
“Amazing and friendly service! I tried my best to put my nans shed together but Franky came to rescue. Managed to arrange convenient time that week and installed the Shed so efficiently. My nan was so pleased once it was finished. Would highly recommend to any one needing any joinery jobs doing.”
Nariah FrancisShed installationvia Google
5 out of 5
“Excellent work carried out on our doors, very professional, work was to a high standard and both kept everything very tidy and clean. I would highly recommend Frankie and team. Thank you!”
Bally DhillonInternal doorsvia Google
5 out of 5
“Franky showed up when said he would, very reliable despite the freezing conditions he did the job. Perfect finish to this installation only job.”
Pammie T MahakaInstallation onlyvia Google

Want something like this?

Send a photo of the space and rough sizes. We will come and measure up, then price it in writing.

Call 07447 907472WhatsApp